Linked Events

  • CANCELED Trail Workday: March 13, 2010

Author Topic: CANCELED Boyette Scrub Preserve Trail Workday  (Read 559 times)

0 Members and 1 Guest are viewing this topic.

Offline Forum Manager

  • Administrator
  • Ninja Master Cyclist
  • *****
  • Posts: 601
  • Karma: +35/-8
  • Use the big ring!
    • SWAMP Mountain Bike Club
CANCELED Boyette Scrub Preserve Trail Workday
« on: March 07, 2010, 02:18:40 PM »
Too much rain to allow the rock to be delivered to the park.


Therefore, the March 13, 2010 workday has been canceled.
« Last Edit: March 12, 2010, 01:38:27 PM by Forum Manager »
Are you a SWAMP Mountain Bike Club member? Ride Guide?
If so, use the Personal Message link to the left, under my name, to send me a PM about upgrading your forum account to SWAMPer or Ride Guide!
Please remember to include your first and last name and when or how you joined SWAMP.

Offline Forum Manager

  • Administrator
  • Ninja Master Cyclist
  • *****
  • Posts: 601
  • Karma: +35/-8
  • Use the big ring!
    • SWAMP Mountain Bike Club
Re: Boyette Scrub Preserve Trail Workday
« Reply #1 on: March 10, 2010, 10:29:56 AM »
Wes says...

The exit causeway on Ridgeline still has standing water. We have a trailer load of large rock to build up the level of the trail that will be underwater again when it rains. We would like to have a small crew on Saturday to repair the causeway, and perhaps other sections that are soft due to standing water.

We meet at the parking lot about 8:45, and depart at 9 am sharp. Bring gloves, and shoes you don't mind getting wet. Tools and lunch will be provided.

Please RSVP to trails at swampclub dot org by noon this Friday (3/12), and let me know if you want lunch.

wes
Are you a SWAMP Mountain Bike Club member? Ride Guide?
If so, use the Personal Message link to the left, under my name, to send me a PM about upgrading your forum account to SWAMPer or Ride Guide!
Please remember to include your first and last name and when or how you joined SWAMP.